GRI-1856: MVP acceptance test plan #80

Merged
vivy merged 1 commit from docs/GRI-1856-mvp-acceptance-test-plan into dev 2026-11-09 18:33:24 +00:00
Member

Summary

Step 1 of GRI-1856: the MVP acceptance test plan, plan/tests/mvp-acceptance.md.

Every case is derived from the GRI-1761 scope table (rev 9) plus the enrolment,
media-pipeline, content-model, offline-first and protocol docs already on
dev. No implementation exists yet (GRI-1838 skeleton still in progress, no
server routes or crates/server tests), so nothing here was read from code.

42 cases across the six scope-table rows: first-user setup, enrolment pending
to approved, IP auto-approve, blocklist, trusted-proxy header spoofing, upload
image/video/PDF/URL, playlist order and durations, offline playback, and
reconnect. Each case has Given/When/Then, a CI level (Unit/Integration/
Contract/E2E/Hardware per testing-strategy.md), and a happy/unhappy pairing.
Packaging rows are marked Hardware-only, matching the existing rule in
testing-strategy.md that there is no Pi/mini-PC in CI to gate on — forge
#28/#29 verify those by hand in the test week.

Step 2 (automated HTTP/WebSocket integration tests) waits on server routes
landing per the parent issue; none have yet.

Test plan

  • ./scripts/local-gates.sh passed locally (Rust + cargo-deny +
    frontend-web check/build)
  • CI runs the same gates on this PR
## Summary Step 1 of GRI-1856: the MVP acceptance test plan, `plan/tests/mvp-acceptance.md`. Every case is derived from the GRI-1761 scope table (rev 9) plus the enrolment, media-pipeline, content-model, offline-first and protocol docs already on `dev`. No implementation exists yet (GRI-1838 skeleton still in progress, no server routes or crates/server tests), so nothing here was read from code. 42 cases across the six scope-table rows: first-user setup, enrolment pending to approved, IP auto-approve, blocklist, trusted-proxy header spoofing, upload image/video/PDF/URL, playlist order and durations, offline playback, and reconnect. Each case has Given/When/Then, a CI level (Unit/Integration/ Contract/E2E/Hardware per `testing-strategy.md`), and a happy/unhappy pairing. Packaging rows are marked Hardware-only, matching the existing rule in `testing-strategy.md` that there is no Pi/mini-PC in CI to gate on — forge #28/#29 verify those by hand in the test week. Step 2 (automated HTTP/WebSocket integration tests) waits on server routes landing per the parent issue; none have yet. ## Test plan - [x] `./scripts/local-gates.sh` passed locally (Rust + cargo-deny + frontend-web check/build) - [ ] CI runs the same gates on this PR
GRI-1856: MVP acceptance test plan from the GRI-1761 scope table
Some checks failed
CI / the pre-push hook (pull_request) Successful in 8s
CI / cargo fmt (pull_request) Successful in 10s
CI / cargo deny (pull_request) Successful in 46s
CI / cargo deny advisories (pull_request) Failing after 42s
CI / repository boundary (pull_request) Successful in 5s
CI / cargo clippy (pull_request) Successful in 9m42s
CI / cargo test (pull_request) Successful in 9m40s
CI / frontend-web (pull_request) Successful in 9m41s
CI / CI (pull_request) Successful in 2s
CI / Notify gate failed (pull_request) Has been skipped
80cdf98cbf
vivy merged commit 6203258982 into dev 2026-11-09 18:33:24 +00:00
vivy deleted branch docs/GRI-1856-mvp-acceptance-test-plan 2026-11-09 18:33:24 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
Grimoirix/grimoire-of-digital-signage!80
No description provided.