MVP acceptance: end-to-end test on a real Ubuntu mini PC #29

Open
opened 2026-11-07 18:58:04 +00:00 by vivy · 2 comments
Owner

What

Run the whole path on real hardware: install server, install client, approve, play web page, image, video and PDF, unplug the network, restart the server.

Done when

Every row of the MVP scope table in GRI-1761 passes on real hardware.

Depends on

#28

Plan

GRI-1761 plan, scope table

Status

Product owner test week, 11-20 onward.


Routing/Hold: no agent is routed to this issue automatically. To take it yourself, assign yourself. Vivy removes the hold when it is handed to an agent.
Created for GRI-1818 from plan/overview/roadmap.md and the MVP plan on GRI-1761.

## What Run the whole path on real hardware: install server, install client, approve, play web page, image, video and PDF, unplug the network, restart the server. ## Done when Every row of the MVP scope table in GRI-1761 passes on real hardware. ## Depends on #28 ## Plan GRI-1761 plan, scope table ## Status Product owner test week, 11-20 onward. --- `Routing/Hold`: no agent is routed to this issue automatically. To take it yourself, assign yourself. Vivy removes the hold when it is handed to an agent. Created for GRI-1818 from `plan/overview/roadmap.md` and the MVP plan on GRI-1761.
Author
Owner

Status 2026-11-10 (Vivy). Software acceptance is in dev: every AC with an API surface has an independent test (PRs #80 #92 #96 #98 #100 #101 #102 #107 #108 #109).

Decisions on Astraea's open findings:

  • AC-2-08 is a real bug (ws.rs:71 ignores the blocklist-off setting). Fix: #110, Nyssa.
  • AC-2-12 per-IP pending cap, AC-3-02 conversion job progress, AC-5-07 offline grace period: deferred past the MVP. None is in the GRI-1761 scope table, and each needs a design first. Building them before 11-17 is scope growth. They stay in the plan, marked deferred.
  • AC-3-03 PDF test stays ignored until the CI image has poppler-utils (production Dockerfile has it).

What is left on this issue is the real mini PC run (AC-6-xx, Hardware level) in the product owner's test week. That is not agent work.

Status 2026-11-10 (Vivy). Software acceptance is in dev: every AC with an API surface has an independent test (PRs #80 #92 #96 #98 #100 #101 #102 #107 #108 #109). Decisions on Astraea's open findings: - **AC-2-08** is a real bug (ws.rs:71 ignores the blocklist-off setting). Fix: #110, Nyssa. - **AC-2-12** per-IP pending cap, **AC-3-02** conversion job progress, **AC-5-07** offline grace period: **deferred past the MVP**. None is in the GRI-1761 scope table, and each needs a design first. Building them before 11-17 is scope growth. They stay in the plan, marked deferred. - **AC-3-03** PDF test stays ignored until the CI image has poppler-utils (production Dockerfile has it). What is left on this issue is the real mini PC run (AC-6-xx, Hardware level) in the product owner's test week. That is not agent work.
Author
Owner

Before this test can start: #113 (panel on the real server), #114 (server serves the panel) and #115 (first full run of the real client against the real server, on the build host). All three are in this milestone.

Before this test can start: #113 (panel on the real server), #114 (server serves the panel) and #115 (first full run of the real client against the real server, on the build host). All three are in this milestone.
Sign in to join this conversation.
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
Grimoirix/grimoire-of-digital-signage#29
No description provided.